Apotex - contamination     www.apotexholocaust.com            www.pharmaholocaust.com
I live like a walking death in twilight zone / some where in between death and a life being deprived of all Human Rights and Constitutional / Law 
protection by habitual offenders. I was assessed by three (3) independent psychiatrists to eliminate offender's speculations about my insanity 
prompting "delusions" etc. All psychiatrists stated clearly, that I am sane /I do NOT have/had any mental illness. No family history of any.
SAMPLE # 7, 8 & 9
SAMPLE # 7:

Conformed by evidence / Management my direct involvement during explosion/ fire in 2002 contrarily to Company’s statements.

Explosion / fire were not contained in one Room as Company claims.

It significantly damaged infrastructure end equipment on two floors since Galley Filling Stations are integrated systems extending trough two floors (at that time additionally included Q-vac and Co-mill systems).

Explosion did cause first face damage (raised and cracked ceiling in production Room, mangled peaces of equipment etc.) and fire (extinguishing of it) did cause second face of damage and contamination of two floors since fire hoses (water) used in attempt to suppress fire could not extinguish combustion with in 2000 pounds Galley Bin (due to immense internal temperature and gas /fumes pressure) and did discharge product from 80 cubic foot (1000 kg) bin on the floors. Fumes contaminated whole area. Discharged product was still baking for many hours on the Floors.

Such mess was sitting left in there for period of few days because apparently Ministry of Labour expressed "interest" in investigation of explosion / fire and its related emergencies  due to fact, that one Operator was injured and in the Hospital (he is permanently disabled now). Apparently Ministry of Labour did not allow any clean up for number of days. Accident area was left unsecured / unprotected and all employees walked all over it (2000 pounds pile of unknown product ) and dispersed it in MFG and PKG areas. Due to very extensive construction all other access was boarded out and personnel did not have any alternative / safe access routs to go in and out. (I WOULD LIKE TO KNOW THE NAME OF THIS PRODUCT IF COMPANY PROVIDES ACTUAL NAME. SO FAR APOTEX REFUSED TO DISCLOSE ANY PRODUCT / ACCIDENT DATA. IT WAS A BIG CONCERN THAT MINISTRY of LABOUR WILL DISCOVER THAT THIS PRODUCT WAS PROCESSED WITH OUT REGULATORS PERMISSION/approval and on equipment not validated / calibrated for such products). In seconds nothing did matter any more.

Exposed to gas / fumes we were entering twilight zone /total obliviousness and sensation of 

flotation /levitation, physical /mental struggle/ fog, breathlessness etc.

Total obliviousness to danger and by many Operators terrifying rages of 

aggression and many other medical/neurological problems etc.


That was one of many products Company processed with out compliance with any regulations and with out providing adequate protection for employees. Sprinkler system / fire alarm system was inoperable due to construction, fact that contractors were on regular bases accidentally starting small fires in Facility or were using / propping open fire doors to go in / out , lack of knowledgeable maintenance etc. It is vital for everyone to realize that fire protection within a structure is a system that relies on all of its components.

Due to very large construction and neglect, buildings , equipment / systems were not compliant with Fire Code nor any other regulations governing production of controlled / restricted substances.

 In structures the owners and operators are responsible to maintain their facilities in accordance with a design-basis that is rooted in laws, including the local building code and fire code, which are enforced by the Authority Having Jurisdiction. Buildings must be constructed in accordance with the version of the building code that is in effect when an application for a building permit is made. Building inspectors check on compliance of a building under construction with the building code. Once construction is complete, a building must be maintained in accordance with the current fire code, which is enforced by the fire prevention officers of a local fire department.

Deviations from that original plan should be made known to the AHJ to make sure that the change is still in compliance with the law to prevent any unsafe conditions that may violate the law and put people at risk.

Company does not have any records of any thing.

It is only logical that Company hides all such Records to avoid any liabilities .

During my employment Company received back WSiB’s fees they contributed for "outstanding" safety record.


SAMPLE # 8 :

The jacketed Kettle / Blending Vessel's accident was a separate case and did occur on 3rd and 2nd floors (also integrated system extending through two floors).

That was also a new not approved product processed on not qualified and not approved equipment. Humongous mixer on the bridge jumped out of the jacket heated Kettle mangling paddles / scraper blades and ripping off open lead of the vessel and safety clamps on the rim of the vessel. WE WERE LUCKY TO NOT GET ANY OPERATORS CHOPPED TO PEACES.

Mess of two floors was left not cleaned up for few months period, because Company did not have any expertise nor any means to deal with product and contaminated equipment (after incident , and after all systems were disabled /down on emergency mode the product solidified as a rock). 

For many months solidified product remained in/on the equipment and powdered active / product / ingredients were all over the two floors.

Many times I was forced by Management to go to this area with out any protection to perform work. Our Systems Programs /Schedules were not integrated into/with production schedule.

Accident area was left unsecured / unprotected and all employees walked all over it. Due to very extensive construction all other access was boarded out and personnel did not have any alternative / safe access routs to go in and out. Other products were continuously processed in immediate area on other pieces of equipment.




SAMPLE # 9 : 
Other incident occurred on new, huge (two Floors ) automated / computerized system (large capacity vacuum mixers and Fluid Air equipment). That was special - "hihg security isolation area".
During/after company processed not approved products on not qualified /not validated equipment resulting in melt down / disintegration of all seals and plastic parts and contamination of equipment and area etc.
We did have on daily bases multi incidents/accidents and substantial product spills.

On contact with product skin cells/ lymphatic vessels ( structures 

that drain lymph) were simply exploding causing horrifying pain and sores 

oozing plasma ( the clear, yellowish fluid containing lymphocytes - white 

blood cells that fight disease) from the tissues , hands, lips, inside of 

mouth/ over the surface of the mouth and tongue, nose, digestive system, 

stomach, rectum/ anus, compromising function of the lungs- respiratory 

muscles, blood vessels, lymphatic system , nerves and all around whole body 

etc.). The tongue was burned / scalded, strange tastes / sensations 

developing. Developing burning mouth syndrome caused by nerve problems. 

Often small, painful ulcers/ sores appeared on the tongue / mouth, disabling 

salivary glands etc. Nerves that help detect and transmit signals to the 

brain were getting severely compromised. At the same time all of it was 

suppressing immune system and inducing many, many more horrifying adverse 

long term symptoms.

In seconds nothing did matter any more.

We were entering twilight zone /total obliviousness and sensation of 

flotation /levitation, physical /mental struggle/ fog, breathlessness etc.

Total obliviousness to danger and by many Operators terrifying rages of 

aggression and many other medical/neurological problems etc.